The New Engineer — HVAC
com.thenewengineer/hvac · 1.2.0
European HVAC sizing: EN 12828 expansion vessels, EN 378 zones, Swiss refrigerant rules.
Nobody here has read this server's code, because it publishes none. The description above is the maker's own, from the registry. A connection test shows whether it answers and what tools it says it has; it never calls a tool, so it cannot show what one does with your data.
Where it sits in the directory's order
What can be seen from outside, weighed as the directory publishes.
Observable signals: 45 of 100 points (at most 60 here)
| Input | Points | What was seen |
|---|---|---|
| Source published | held at 0 | No entry here publishes source: that is what puts it in this directory. |
| Licence stated | held at 0 | With no files, there is nothing for a licence to be stated in or held against. |
| Advisory state | held at 0 | Advisory databases index packages, and these entries publish none, so there is nothing to look up. |
| Auth declared | 0 of 15 | The registry entry declares no key. That is what it declares, not a finding that it has no protection. |
| Latest connection test reached it | 20 of 20 |
Where it answers
https://thenewengineer.com/mcpstreamable-http
Connection test
The MCP handshake, then a request for the tool list, with no key and no data of yours. Run nightly, and by anyone, at most once every ten minutes per server.
It completed the handshake and listed 10 tools.
- Protocol
- 2025-06-18
- Calls itself
- the-new-engineer 1.1.0
- Handshake time
- 338 ms
- HTTP status
- 200
The tools it lists (10, as of 20 hours ago)
The tool-description rules found nothing in these descriptions. They look for instructions aimed at a model and for hidden characters; they cannot see what a tool does when it runs.
size_expansion_vesselDETERMINISTIC: the same inputs always give the same result — from any AI, on any day. Figures come from the standard's tables and formulas, never from a language model's estimate. Every step is auditable. Size the expansion vessel and pressurisation of a closed heating or chilled-water circuit to EN 12828: static height, minimum pressure p0, fill pressure pa, final pressure pe, expansion volume, water reserve, nominal vessel volume with the standard vessel to buy, safety valve setting together with the minimum it must not fall below, pressure class of the lowest equipment,
water_content_from_vesselDETERMINISTIC: the same inputs always give the same result — from any AI, on any day. Figures come from the standard's tables and formulas, never from a language model's estimate. Every step is auditable. Deduce the water content of an installation from the expansion vessel already fitted. WHAT THIS IS FOR. Refurbishment, and site visits with no drawings. Sizing a new vessel, a new pump or a new generator needs the water content, and on an existing installation nobody has it: the drawings are lost, or never matched what was built. The vessel on the wall is the one piece of evidence still sta
check_refrigerant_switzerlandDETERMINISTIC: the same inputs always give the same result — from any AI, on any day. Figures come from the regulation's annexes and thresholds, never from a language model's estimate. Every step is auditable. Swiss refrigerant regulation check (ORRChim / ChemRRV annex 2.10, OFEV synthesis of May 2026, rules adopted 29.10.2025) plus refrigerant data from EN 378-1 Annex E: GWP (AR4, the ORRChim basis), ODP, LFL, safety class, practical limit. Returns, for a given refrigerant and installation: the date from which machines using it can no longer be placed on the Swiss market (import from 01.01.
check_en378_zonesDETERMINISTIC: the same inputs always give the same result — from any AI, on any day. Figures come from the standard's tables and formulas, never from a language model's estimate. Every step is auditable. EN 378 applied to BUILDING projects, volume by volume. An installation does not occupy one room but several: the machine, the rooms crossed by refrigerant lines, the rooms served by indoor units. Each volume is classified on its own — access category (a/b/c) and location class (I–IV) — and each classification calls for its own measures. The tool answers per volume, never as a single verdict
How this entry becomes a listing
For the maker. The catalogue lists what it can read, and this server publishes nothing to read yet. There are two routes, and only the first is open today.
Publish the source Open today
- Put the server's source in a public repository on github.com, with a licence.
- Keep a server.json in that repository naming this server,
com.thenewengineer/hvac, and declare the repository in it:"repository": { "url": "https://github.com/owner/repo", "source": "github" }, adding"subfolder"when the server lives in a folder. - Publish that version to the official MCP registry.
- The nightly registry sweep records the declaration. This page stays, dated, and says the source is declared but not yet read.
- The catalogue reads declared repositories at a pinned commit, in batches run by hand, and lists the servers that meet the batch's rules (among them a server.json at that commit naming the server, an https endpoint and a licence). When it lists this server, this page links to the listing. There is no schedule, so no date can be promised.
List it through the maker studio Not open yet
From the official MCP registry, last updated there 14 days ago. The registry entry · thenewengineer.com